The leaders of the Group of Seven (G7) large industrialised nations should incentivise the extension of the operating life of existing nuclear reactors and support the restart of others to help achieve the goal of achieving a low-carbon and secure energy supply, the nuclear industry has said.
read more... 27/06/2022
France's Nuward small modular reactor (SMR) design will be the case study for a European early joint regulatory review led by the French nuclear safety regulator with the participation of the Czech and Finnish nuclear regulators, EDF has announced.
read more... 07/06/2022
French utility EDF said on Thursday it was pushing back the start date on its Hinkley Point C nuclear reactor to June 2027 and now estimated project costs in the range of 25 billion to 26 billion pounds ($31 to $32 billion).
read more... 20/05/2022
The head of French nuclear regulator ASN said on Tuesday (17 May) that fixing corrosion problems at some of state-controlled utility EDF’s nuclear reactors would require a “large scale” plan and “several years” as he warned of a risk more reactors could be halted.
read more... 18/05/2022
EDF has said it found indications of possible stress corrosion on the auxiliary circuits of four French nuclear power reactors totalling 4.8 GW in capacity, namely Chinon 3, Cattenom 3, Flamanville 2 and Golfech 1.
read more... 20/04/2022