Latest news

G7 urged to back nuclear extensions to tackle climate, security issues

The leaders of the Group of Seven (G7) large industrialised nations should incentivise the extension of the operating life of existing nuclear reactors and support the restart of others to help achieve the goal of achieving a low-carbon and secure energy supply, the nuclear industry has said.

read more... 27/06/2022

news

European regulators to cooperate on Nuward SMR licensing

France's Nuward small modular reactor (SMR) design will be the case study for a European early joint regulatory review led by the French nuclear safety regulator with the participation of the Czech and Finnish nuclear regulators, EDF has announced.

read more... 07/06/2022

news

EDF says Hinkley Point start now June 2027, costs rise

French utility EDF said on Thursday it was pushing back the start date on its Hinkley Point C nuclear reactor to June 2027 and now estimated project costs in the range of 25 billion to 26 billion pounds ($31 to $32 billion).

read more... 20/05/2022

news

Fixing EDF’s reactors corrosion mystery to take several years, French regulator warns

The head of French nuclear regulator ASN said on Tuesday (17 May) that fixing corrosion problems at some of state-controlled utility EDF’s nuclear reactors would require a “large scale” plan and “several years” as he warned of a risk more reactors could be halted.

read more... 18/05/2022

news

EDF finds indications of possible corrosion on 4 reactors

EDF has said it found indications of possible stress corrosion on the auxiliary circuits of four French nuclear power reactors totalling 4.8 GW in capacity, namely Chinon 3, Cattenom 3, Flamanville 2 and Golfech 1.

read more... 20/04/2022

news